Scaffolding and Concrete
18.01.19
Work is progressing at pace at our project in Suffolk. The fair-face concrete walls to the new kitchen pavilion have been poured and the formwork struck. The barn is being re-roofed and the original timbers cleaned by dry ice blasting.